TBDY 2018 story force distribution

Distributes the base shear VtE over the stories per §4.7.2, including the additional top-story force ΔFNE = 0.0075·N·VtE.

Inputs

Storywi (mass/weight)Hi [m]wi·HiFi [kN]
ΔFNE = kN · Σ(wi·Hi) = Σ Fi = kN (= VtE)

Citations

§4.7.2.2ΔFNE = 0.0075·N·VtE, added at the top story (Denk. 4.22).
§4.7.2.3FiE = (VtE−ΔFNE)·(wi·Hi)/Σ(wj·Hj) (Denk. 4.23).
VERIFYReproduces a published worked example (VtE=28.31, 4 stories → F4=9.83, F3=9.24, F2=6.15, F1=3.09; Σ=28.31).
Base-shear tool

Preliminary calculation tool. Results are for preliminary sizing and cross-check only. Final design, sealed responsibility, and permit submissions require the full official text of the referenced regulations and the review of a licensed engineer.